Prepfully logo
  • Browse Coaches
  • Login
BetaTry Out Our New AI Mock Interviewer – Your Smartest Way to Ace Any Interview!Try Our AI Mock Interviewer
Try Now
NewRegister as a coach and get a $100 bonus on your first completed session if you're on the Prepfully Request for Coaches list.Coach $100 Bonus
Read More
LimitedSummer Deal: Heavy discounts on all Prepfully sessions.Summer Deal: Discounts
Book Now

Your AI Wingman for your next interview

The most comprehensive bank Interview Answer Review tooling available online.

Cutting-edge AI technology meets personalized feedback. Improve your interview answers with insightful guidance provided by a model trained against more than a million human-labelled interview answers.
  • Company rubrics
  • Role-level optimisations
  • Trained on 1mil+ answers
Behavioral
2 years ago
Is there a particular instance where you had to confront and manage adverse feedback?
Design Verification EngineerEmbedded Engineer

Mitsubishi Electric

AT&T

Magneti Marelli

Get answer reviewed by AI
2 years ago
Design
2 years ago
Please describe how delay and slew rate vary in VLSI design.
Design Verification Engineer

Apple

Amazon

Blue Origin

Get answer reviewed by AI
2 years ago
Behavioral
2 years ago
In your view, what constitutes successful outcomes?
Design Verification EngineerEmbedded Engineer

Amazon

Meta Logo

Meta

Amgen Logo

Amgen

Situation:

Success can be measured in different ways depending on the context—whether it’s a project milestone, team collaboration, or personal growth. For me, success is about achieving the intended goal while creating a lasting impact, whether that means delivering high-quality verification, improving efficiency, or mentoring others to grow.

Task:

One example that defines my success criteria was when I was responsible for closing the verification of a complex IP. The challenge was that I had limited resources—a team of mostly junior and mid-level engineers—and tight timelines. Success in this scenario wasn’t just about delivering verification but also ensuring that my team could ramp up and work independently.

Action:

To achieve this, I:

  • Developed structured onboarding materials to accelerate the team's understanding of the testbench.
  • Strategized task distribution to ensure each engineer had ownership of a small but impactful portion of the verification process.
  • Created a collaborative debugging process, where team members could efficiently troubleshoot and escalate issues.
  • Ensured verification coverage met the expected metrics while identifying and fixing key testbench gaps.

Result:

We successfully completed verification on time, identified critical testbench bugs, and delivered a well-documented framework that continues to benefit future teams. To me, this was a success because:

  1. The technical objective (verification sign-off) was achieved.
  2. The team grew and became self-sufficient, reducing dependency on senior engineers.
  3. The long-term impact was positive, as the documentation and processes set up are still in use.

Get answer reviewed by AI
2 years ago
Technical
2 years ago
In your own words, how would you describe a cache and its mechanism of action?
Design Verification Engineer

Amazon

Garmin Logo

Garmin

Keysight Technologies Logo

Keysight Technologies

Get answer reviewed by AI
2 years ago
Technical
2 years ago
Why are assertions an integral part of our process?
Design Verification Engineer
AMD Logo

AMD

Fujikura Logo

Fujikura

Agilent Technologies Logo

Agilent Technologies

Get answer reviewed by AI
2 years ago
Algorithms
2 years ago
How do you go about establishing if a string is a palindrome?
Design Verification Engineer
Google Logo

Google

NETGEAR Logo

NETGEAR

Thales Logo

Thales

Get answer reviewed by AI
2 years ago
Technical
2 years ago
When presented with a bug report from the verification team, what is your strategy for rectification?
Design Verification Engineer

Apple

Lattice Semiconductor Logo

Lattice Semiconductor

Cirrus Logic Logo

Cirrus Logic

Get answer reviewed by AI
2 years ago
Circuits
2 years ago
When J and K inputs of a JK flip-flop are set to 0, and it's driven by a 10MHz square wave, what is the resulting output frequency?
Design Verification Engineer
Xiaomi Logo

Xiaomi

Western Digital Logo

Western Digital

Alstom Logo

Alstom

Get answer reviewed by AI
2 years ago
Technical
2 years ago
What characterizes an event in Verilog?
Design Verification Engineer

Amazon

SpaceX Logo

SpaceX

Taiwan Semiconductor Logo

Taiwan Semiconductor

Get answer reviewed by AI
2 years ago
Technical
2 years ago
Can you clarify the distinction between blocking and non-blocking assignments in Verilog?
Design Verification Engineer
Sony Logo

Sony

Medtronic Logo

Medtronic

Xilinx Logo

Xilinx

Get answer reviewed by AI
2 years ago

Try Free AI Interview

Amazon logo

Amazon

Design Verification Engineer

Prepare for Behavioral interview at Amazon

Behavioral
Google logo

Google

Design Verification Engineer

Prepare for Behavioral interview at Google

Behavioral
Meta logo

Meta

Design Verification Engineer

Prepare for Behavioral interview at Meta

Behavioral

Question of the week

We'll send you a weekly question to practice for:

Showing 10281 to 10290 of 32498 results

Previous10271028102910301031Next

*All interview questions are submitted by recent Design Verification Engineer candidates, labelled and categorized by Prepfully, and then published after verification by current and ex-Design Verification Engineer employees.

  • Company
  • FAQs
  • Contact Us
  • Become An Expert
  • Services
  • Practice Interviews
  • Interview Guides
  • Interview Questions
  • Watch Recorded Interviews
  • Gift sessions
  • AI Interview
  • Social
  • Twitter
  • Facebook
  • LinkedIn
  • YouTube
  • Legal
  • Terms & Conditions
  • Privacy Policy
  • Illustrations by Storyset

© 2025 Prepfully. All rights reserved.

Prepfully logo

Please log in to view more questions.

Not a member yet? Sign up for free.